Integration and MDI
Integration and machine detector interface working group pages. Working group leaders are Tauchi Toshiaki and Karsten Buesser.
-
Task List
- prepared by T. Tauchi and K. Buesser
-
Notes from Zeuthen meeting
- prepared by T. Tauchi
-
Minutes from discussions at Zeuthen
- prepared by T. Tauchi
-
summary from Sendai meeting
-
IR Interface Document
-
Summary of MDI/I meeting at ECFA2008, Warsaw
- prepared by C.Clerc
-
ILD Action list, 30/06/2008
- prepared by H.Videau
-
Draft Qs to sub-detector groups for the integration, 15/07/08
- We would like to distribute these questions to sub-detector contact persons as soon as possible for efficient discussion at the ILD Cambridge meeting.
-
Eight versus twelve, few remarks
- I tried to put together arguments for the debate.
-
Short information about ECAL
- This file contains answers to questions from the MDI-integration group concerning dimensions and miscellaneous points like power dissipated, cable volume etc.
-
Note on the beam tube
- This note summarises some work done for designing the beam pipe
-
ILD00 & MOKKA
- Contains the first version of ILD00 CAD model ( from Mathieu Jore), and a comparison of Mokka and engineering values. ( nov2008)
-
ILD dimensions and weigth
-
TILC09